THESE
PROJECTS REQUIRE PLAN AND SPECIFICATION REVIEW FOR COMPLIANCE WITH
ACCESSIBILITY STANDARDS ONLY. FINAL PLAN SUBMITTAL SHALL BE IN
ACCORDANCE WITH CHAPTER 3. SCHEMATIC AND PRELIMINARY PLAN
SUBMITTALS ARE NOT REQUIRED. USE ABC Form B-1: TRANSMITTAL OF
PLANS AND/OR SPECIFICATIONS, WHEN SUBMITTING DESIGN DOCUMENTS FOR
REVIEW.
-
THESE
PROJECTS ARE NOT ADMINISTERED BY THE ABC; THEREFORE, THE REQUIREMENTS
AND PROCEDURES OF CHAPTERS 4, 5, 6, 7, AND 8
DO NOT APPLY.
-
EXCEPT
AS STATED ABOVE, USE UNIFORM DOCUMENTS AND STANDARD FORMS AS DEEMED
APPROPRIATE BY THE OWNER FOR DESIGN PROFESSIONAL SERVICES, PROJECT
MANUAL, AND CONSTRUCTION CONTRACT. DO NOT USE
ABC UNIFORM DOCUMENTS AND STANDARD FORMS.
1. Submit original documents - no carbon copies.
2. Do not highlight text. Highlighted text does not produce a good
scanned image.
3. Preferably, submit only letter size (82 X 11) documents.
4. Preferably, send only one-sided documents .
TYPICAL ROUTING OF DESIGN DOCUMENTS DURING PLAN
REVIEW
All submissions of design documents
must be transmitted using
ABC Form B-1, TRANSMITTAL of PLANS
and/or SPECIFICATIONS.
1. DESIGN PROFESSIONAL
SUBMITS FINAL PLANS AND SPECIFICATIONS TO ABC FOR
ACCESSIBILITY REVIEW AND APPROVAL
2. ALABAMA BUILDING COMMISSION
a. REVIEWS FINAL PLANS AND SPECIFICATIONS FOR
COMPLIANCE WITH ACCESSIBILITY STANDARDS
b. CONFIRMS APPROVAL OR REJECTION WITH A "PROJECT
COMMENT LETTER" TO THE DESIGN PROFESSIONAL AND OWNER
c. RETAINS APPROVED FINAL SUBMISSION AS A PART OF THE
PROJECT RECORD
3. DESIGN PROFESSIONAL
ADDRESSES REVIEW COMMENTS BY ABC, ADVANCING TO OBTAIN
APPROVAL
|