THESE
PROJECTS ARE NOT ADMINISTERED BY THE ABC; THEREFORE, THE REQUIREMENTS
AND PROCEDURES OF CHAPTERS 4, 5, 6, AND 7 DO
NOT APPLY.
-
THE ABC
INSPECTS LOCALLY FUNDED, K-12 PROJECTS; THEREFORE, THE REQUIREMENTS
AND PROCEDURES OF CHAPTER 8 APPLY. USE ABC Form B-10, STATEMENT of
FIELD OBSERVATIONS.
1. Submit original documents - no carbon copies.
2. Do not highlight text. Highlighted text does not produce a good
scanned image.
3. Preferably, submit only letter size (8½ X 11) documents.
4. Preferably, send only one-sided documents.
TYPICAL ROUTING OF DESIGN DOCUMENTS DURING PLAN
REVIEW
All submissions of design documents must be
transmitted using
ABC Form B-1: TRANSMITTAL of PLANS and/or
SPECIFICATIONS.
1. DESIGN PROFESSIONAL
a. PREPARES DESIGN-BID DOCUMENTS (SCHEMATIC)
(PRELIMINARY) (FINAL)
b. REVIEWS EACH LEVEL OF DESIGN WITH LOCAL EDUCATION
AUTHORITY (LEA) FOR APPROVAL PER O/A AGREEMENT
c. SUBMITS EACH LEVEL OF DESIGN-BID DOCUMENTS TO ABC
AND SDE FOR REVIEW AND APPROVAL
d. SUBMITS "FINAL" DESIGN DOCUMENTS TO OTHER
REVIEWING AGENCIES (DEPT. OF PUBLIC HEALTH, etc.) CONCURRENTLY WITH
SUBMISSION TO ABC & SDE
2. STATE DEPARTMENT OF EDUCATION(STATE SCHOOL ARCHITECT)
a. REVIEWS EACH LEVEL OF DESIGN/BID DOCUMENTS FOR
COMPLIANCE WITH SDE REQUIREMENTS
b. NOTIFIES DESIGN PROFESSIONAL, LEA, AND ABC OF
REVIEW COMMENTS
3. ALABAMA BUILDING COMMISSION
a. REVIEWS EACH LEVEL OF DESIGN FOR COMPLIANCE WITH
CODE AND ABC REQUIREMENTS
b. CONFIRMS APPROVAL OR REJECTION WITH A "PROJECT
COMMENT LETTER" TO THE DESIGN PROFESSIONAL AND LEA
c. RETAINS SCHEMATIC & PRELIMINARY SUBMISSIONS UNTIL FINAL SUBMISSION
IS APPROVED: RETAINS APPROVED, FINAL SUBMISSION AS A PART OF THE PROJECT
4. DESIGN PROFESSIONAL
a. ADDRESSES REVIEW COMMENTS BY ABC & SDE, ADVANCING
TO THE NEXT LEVEL OF DESIGN/ UNTIL APPROVAL OF FINAL SUBMISSION IS
OBTAINED
b. UPON OBTAINING APPROVAL OF FINAL SUBMISSION,
FOLLOWS SDE's PROCEDURES FOR ADVERTISING AND RECEIVING BIDS.
|